As the Al Noori Muslim Primary school grew, there was an impulse to create a High School Campus, and in early 2010 ACE was engaged as the lead Structural Engineering consultancy with the new facilities opening in 2013.
ACE has been engaged to provide Structural Design and Documentation, Post tensioning Design and documentation.